Axminster T-2000CK Manuel d'instructions

Naviguer en ligne ou télécharger Manuel d'instructions pour Scrubber Axminster T-2000CK. Axminster T-2000CK Instruction manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1

T-2000CK 1hp Cyclone ExtractorCode 505087AXMINSTERSERIESTrade

Page 2 - Declaration of Conformity

Assembly Instructions10Fig 14-1511Clamping ringRimStep 9 Locate the bin cover (10), 1/4 " Hex bolts (h) and 1/4" domed head nuts (c). Place

Page 3 - What’s Included

Assembly Instructions11Step 12 Turn the cyclone assembly upright on its wheels, WARNING! THE MACHINE IS HEAVY YOU ARE ADVISED TO SEEK HELP! locate the

Page 4

Assembly Instructions12You will require the steel ducting (12), steel ducting seal (18), 5/16" button head Hex bolts (e), 5/16" button head

Page 5

Assembly Instructions13Step 20 Locate the manometer and hose (16), remove the fixings from the lower leg square tube (2), offer up the two pre-drilled

Page 6 - Specific Safety

Overview Description141 Motor Assembly2 Upper Leg Square Tube3 Lower Leg Square Tube4 Cross Support Bracket7 Extraction Drum 8 Flexible Hose9 Bin10 Bi

Page 7 - Assembly Instructions

Overview Description15NVR switch assembly with (O) indicating (OFF) and (I)indicating (ON). For emergencies “SLAP” the shrouddown to “STOP” the machi

Page 8 - THIS STAGE!

Operating and Adjustments16ALWAYS TURN ON/OFF THE EXTRACTOR BY THE NVR CONTROL SWITCH NOT THE MAINS SWITCHSwitching ON/OFFLevelling the ExtractorMano

Page 9 - Fig 12-13

Maintenance17Daily• Empty the collection bag before it overows, wear a dust mask whilst removing and emptying the bag. Weekly • Check the inlet and o

Page 10 - Fig 19-20

Weekly LEV System Maintenance Log18Week DateChecked by Check all ducting for physical damageCheck inlets, clear any obstructions if foundCheck o

Page 11

Weekly LEV System Maintenance Log19Week DateChecked by Check all ducting for physical damageCheck inlets, clear any obstructions if foundCheck o

Page 12

Index of Contents2Declaration of ConformityCopied from CE CertificateThe undersigned N. Sifonios, authorised by Meta International Co., Ltd No. 38-46,

Page 13

LEV Testing20Why should I bother with LEV? The law says you must control the risks from these substances (the Control of Substances Hazardous to Healt

Page 14 - NVR switch assembly

Parts Drawing/List21

Page 15 - Overview Description

Parts Drawing/List22NO. Description Specification Q’TY1 Hose Clamp 1-1/2” 22 Flange Nut 1/4” 83 Nut 1/4” 24 Spring Washer 1/4” 15 Lock Nut M4 126

Page 16 - Operating and Adjustments

Parts Drawing/List2339 Lock Nut M10 140 PE Bag Big(101) 141 PE Bag Small 142 Phil. HD Screw 1/4” x 5/8” 243 Phil. HD Screw M5 x 10mm 344 Phil. HD Sc

Page 17 - Maintenance

Wiring Diagram24

Page 18

Notes25

Page 19

Axminster Tools & Machinery LtdWeycroft Avenue, Axminster, Devon EX13 5PHaxminster.co.ukPlease dispose of packaging for the product in a responsib

Page 20 - LEV Testing

What’s Included3Quantity Item Model Number T-2000CK1 No 1hp Cyclone Extractor (Code: 505087) Part1 No Motor Assembly 13 No U

Page 21 - Parts Drawing/List

What’s Included43 4562711 12 13148 9 10

Page 22

What’s Included51516171819 20 21 222423a bc de f g h ij k l m

Page 23

General Instruction for 230V Machines6These machines are supplied with a moulded 16 Amp plug and 3 core power cable. Before using the machine, inspect

Page 24 - Wiring Diagram

Specific Safety for Dust Extractors7Keep the particle filter clean. The machine relies on its ability to ‘blow’ air through the filter, to generate good

Page 25

Assembly Instructions8Having unpacked the boxes, put all components where they are readily to hand. Locate the motor assemby (1), the upper and lower

Page 26 - AXMINSTER

Assembly Instructions9Step 4 Locate the angle brackets (6), place the bracket flat against the upper square tube (2), line up the pre-drilled holes and

Commentaires sur ces manuels

Pas de commentaire